HGX B200 SXM6: 8-GPU Server System

First-generation Blackwell. 180 GB HBM3e per GPU, NVLink 5, NDR800. New-build only, no secondary market yet.

New build, factory order$565,000stable MoM
Lead time14–20 weeks
Live lots1

Currently available HGX B200 systems

New build via OEM factory order only. Prices shown against the Rack Rate Index median, deal score is automatic.

NewQty 12
$555,000 /system

8×B200 SXM6 HGX — OEM, factory sealed

8× B200 SXM6 180GB · liquid-cooling ready · NDR800 fabric

US14–18 wks

What HGX B200 systems trade at

SeriesMinMedianMaxNMoM
New build, factory order$540,000$565,000$590,0007stable

Full server system pricing: chassis, NDR networking, host CPUs, and memory included. Indicative market ranges, updated Jul 18, 2026. Verified series publish once they clear our N-quote threshold: median of verified quotes, supplier-blind.

HGX B200: full system specs

GPUs8× NVIDIA B200 SXM6
GPU memory180 GB HBM3e per GPU · 1.4 TB total
Memory bandwidth8.0 TB/s per GPU · 64 TB/s total
GPU interconnectNVLink 5 · 1.8 TB/s bisection · NVSwitch
FP4 (system)~144 PFLOPS dense
FP8 (system)~72 PFLOPS dense
GPU TDP1,000 W per GPU
System power draw~14–16 kW · plan 18–20 kW with PUE
Host platform2× Xeon SP or EPYC · 2 TB DDR5 · PCIe Gen 5
Common chassisSupermicro SYS-821GE-TNHR · Dell XE9780
Network fabric8× ConnectX-8 800G NDR800 InfiniBand
Form factor10U, increased power and cooling vs H100

Should you buy a HGX B200?

Buy HGX B200 if

Building a frontier training cluster

B200's 4× FLOPS improvement over H100 and 2.25× memory bandwidth justify the price for large-scale training. The roadmap is Blackwell.

Buy HGX B200 if

You can absorb 14–20 week lead time

New Blackwell is the right call if you're planning a cluster that runs for 3+ years and timing isn't the constraint.

Consider alternatives if

Consider H100 for immediate capacity

H100 deploys in 1–3 weeks at $250K/system. If you need GPUs now, the secondary market wins on speed.

HGX H100 pricing →

Used vs refurb: what the premium buys

FactorUsed, testedRefurb, warranted
WarrantyNone / seller DOA window90-day seller warranty + DOA
Burn-in reportAvailable (ask for it)Included and certified
Price premium+8–12% over used median
Right forBuyers who can evaluate burn-in logsTeams who want turnkey assurance

What to verify before buying

At this price point, skipping due diligence is expensive. Every item below should have a documented answer before you wire funds.

  • Verify OEM factory order is confirmed, not just quoted
  • Lock allocation terms in writing: delivery window, cancellation terms
  • Power infrastructure: B200 needs ~14–16 kW per node vs ~10 kW for H100
  • Confirm NDR800 switch compatibility if expanding an existing NDR cluster

Export control notice

B200 carries advanced export controls, stricter than H100/H200. Verify end-user and destination against current BIS entity lists before placing an order.

Looking to buy HGX B200 systems?

Submit your requirements: quantity, condition, timeline, and budget. We benchmark against the Index and match you with verified supply.

Have HGX B200 inventory to sell?

List your lot: describe what you have, condition, and quantity. We benchmark against the Index and surface it to qualified buyers.

Other GPU server systems