Site class
Colocation hall or wholesale suite
A dedicated room or suite, usually leased by the MW.
- Committed MW in a single hall
- N+1 or 2N UPS and generators sized to the load
- Liquid-cooling loop in place if the racks need it
Typical lead time 1 to 6 months where capacity exists
Cooling and density · 29 kW per rack
Needs hot or cold aisle containment, and often rear-door heat exchangers. Many older halls cap well below this.
Sized for max draw, because training runs close to it and a site usually outlives its first workload. Average draw, and so the power bill, runs lower: training typically averages 75–85% of max, inference 55–65%.
Planning estimates from public spec sheets, at each system’s maximum rated power, plus 12% for networking, storage and management. Real draw is often lower; real sites add redundancy on top. Use this to frame the conversation with a site or an engineer, not as a design.